国家开放大学(福建开放大学)24秋《理工英语4》形考作业4【形考作业】
国开(福建开放大学)24秋《理工英语4》形考作业4【国开作业】单元自测4(10分)
试卷总分:100 咨询请添加 QQ:3322618020 微信:zexue66
一、选择填空:阅读下面的对话或句子,从A、B、C三个选项中选出一个能填入空白处的最佳选项。
1.— 3D printingis one of the latest technologicalinnovations.
—____Maybe its functions are questionable.
A.Really
B.Exactly.
C.I think so.
2.—They are testing the 3D printer. Don’t you come and see it
—What
A.Where is it displayed
B.It really matters.
C.That’s fine.
3.—Do youlike that technology exhibition
— Yes, Ilike it very much. .
A.It finally comes true.
B.It shows me the impressive magic power of 3D printing.
C.It is a good chance.
4.There are ____ calls for lawmakers to consider copyright laws.
A.increase
B.increasing
C.increased
5.This 3D printer was designed ____ produce snacks.
A.to
B.for
C.with
6.二、阅读理解:阅读下面的短文,根据文章内容进行判断,正确为“T”,错误为“F”。
Passage 1(教材课文原文)
“The printer did not always manage to spread the plastic evenly, making some of the ribs of the honeycomb structure of the block uneven,” reported ARN(Australian Radio Network)to the surprise of no one who has used a 3D printer. But the architects remain optimistic. The first few printed blocks are meant to be test pieces as they improve the process.
It takes about a week to print a 3-meter high block right now. The project’s leaders hope to eventually get that down to two hours and finish the first of 12 rooms in a year, and the entire house in less than 3 years.
Ultimately, 3D Print Canal House is an architectural research project, one that is very much being conducted in the public eye: you can actually buy tickets to visit the construction site for 2.50 Euros.
The top floors will become more ornate, for example, as newer techniques are incorporated. They’ll explore the possibilities of 3D printing, like the honeycomb walls or an entire room recycled, redesigned, and built anew. Nobody’s going to move i国开泽学网微信:zexue66nto a 3D printed house soon, but, if anyone ever does, something might be learned from this experiment by the canal.
According to the passage, the 3D printer can type with plastic evenly. 1
2. This 3D printerprinted some blocks totestits work. 2
3. The project’s leaders will finishthe entire house in less than 3 years. 3
4. 3D Print Canal House is printed to live. 4
5. The canal house will be decorated more. 5
(1).__1__
A.T
B.F
(2).__2__
A.T
B.F
(3).__3__
A.T
B.F
(4).__4__
A.T
B.F
(5).__5__
A.T
B.F
版权保护: 本文由 奥鹏/电大作业答案-泽学网-专业的毕业论文辅导网 原创,转载请保留链接: https://www.zexuewang.nethttps://www.zexuewang.net/guokai/36212.html